All for Joomla All for Webmasters

Infrastructure

Zymo Cosmetics > Infrastructure

Manufacturing Unit

  • FDA Approved Cosmetics Manufacturing Unit
  • FDCA Approved Cosmetics GMP
  • ISO 9001:2015 Certified Quality Management System
  • 15000 Sq.ft. of RCC Factory Having Vitrified Tiles On Floors And Glaze Tiles On Walls.
  • 25000 Sq.ft. Of Spare Land For Future Expansion.
  • High Tech Manufacturing & Filling Facility
  • At Par In-House Laboratory Facility For R&D And
    Quality Control
  • CCTV Surveillance Of All Key Manufacturing Areas

Research & Development

  • Advanced In-House Laboratory Facility To Cary Out Research & Development
  • Innovative & Visionary Top Management
  • Qualified & Experienced Chemists To Formulate New Ideas To The Satisfaction of The Customers
  • We Can Formulate Products To Best Match With Our Customers’ Benchmark Products
  • OR We Have Our Own Rage Of Stock Formulas Which Are Known For Their Quality
  • Not Only Formula, We Also Help In Developing Right Packaging As Per The Requirements Of Customers

Manufacturing & Filling

  • Manufacturing Plants For 2000 Ltr. & 1000 Ltr. Batch Sizes
  • All Vessels Are Made From SS-316 To Prevent Material Reaction & To Maintain Batch Hygiene
  • All Material Contact Parts Are Of SS-316 Only
  • Care Has Been Taken To Avoid Human Contact With The Manufactured Product Till It Has Been Filled In the Respective Container.
  • Strategically Implemented 3-Way Filter Mechanism In Manufacturing Process
  • Filling Facility For Tubes, Bottles & Jars For Sizes 10ml to 1000ml
  • Packaging Facility For Labels, Shrink Sleeves, Cartons, Box Wrapping & Strapping.
  • Average Monthly Manufacturing Capacity – 1.25 Million PCs.

Quality Control

  • Quality Management System In Strict Compliance With ISO 9001:2015
  • FDCA Certified Cosmetics GMP (Good Manufacturing Practices)
  • In Ward Inspection Of Every Raw & Packaging Material To Confirm The Desired Quality Specifications
  • In House Testing Laboratory To Confirm Quality Of Manufactured Products Before Dispatch
  • In House Microbial Testing Laboratory Setup
  • Product Stability Testing Under Controlled Temperature & Humidity For 1, 3, 6 & 12 Months Duration
  • 2 Retain Samples Of Each Batch Are Stored For The Life Cycle Of The Product.